In global supply chains, rapid response and thorough resolution of quality issues are fundamental competencies for any mature manufacturing enterprise. As a company specializing in the casting and machining of metal components such as aluminum, zinc, we understand that quality not only underpins customer trust but also determines our long-term competitiveness in the international marketplace.
 
Recently, we received a quality complaint from an overseas client regarding a batch of delivered castings where certain products exhibited dimensional deviations. Immediate action was required. The company promptly initiated the 8D report problem-solving process. Through a structured, data-driven, and collaborative approach, we progressed from initial issue containment to ultimately preventing recurrence, ensuring the delivery of precise and reliable solutions to our client.
 

1. Rapid Formation of Cross-Departmental Task Force (D1)
Upon receiving the complaint, we swiftly assembled a task force comprising Quality, Process Engineering, Production, Equipment, and Tooling departments. This team assumed full responsibility for investigating and resolving the incident, ensuring rapid coordination across all stages. During the meeting, we clarified individual roles and responsibilities and initiated an in-depth investigation.

8D Report Meeting

2. Define Problem Scope and Details (D2)
The task force systematically analyzed the issue using the 5W2H method, identifying its characteristics, affected batches, occurrence locations, and quantity ratios. This established an objective and accurate foundation for subsequent investigations.

8D report

3. Implement Temporary Containment Measures (D3)
To prevent disruption to customer production, our company implemented temporary measures including suspending relevant production lines, conducting 100% re-inspection of inventory and work-in-progress, and strengthening specialized inspection items to ensure the issue did not recur.

4. Root Cause Investigation (D4)
Through a multi-dimensional investigation encompassing process traceability, mold inspection, equipment record analysis, and material retesting, coupled with repeated verification during production, the team identified the root cause: thermal expansion and contraction may cause dimensional fluctuations as weather temperatures fluctuate. This finding has been reviewed and confirmed by an internal expert panel.

8D Report Meeting

5. Develop and validate corrective actions (D5)
Addressing the root cause, our company implemented a series of corrective measures including mold structure optimization, temperature control system upgrades, enhanced casting press pressure monitoring, and standardized work procedures. Their effectiveness was validated through testing and inspection.

8D Report Meeting

6. Fully implement permanent improvement measures (D6)
The corrective actions have been formally integrated into the production system. Relevant personnel have undergone retraining to ensure all changes are fully implemented.

7. Establishing Long-Term Prevention Mechanisms (D7)
This case has been incorporated into our quality system database. Preventive capabilities are further strengthened through increased mold inspection frequency, enhanced process parameter traceability, and ongoing automation of critical processes.

8D Report Meeting

8. Team Collaboration and Continuous Improvement (D8)
team involved in resolving this issue and organized an experience-sharing session, laying the foundation for future quality enhancements.

INNOVAW consistently prioritizes customer experience. The swift response and rigorous handling of this incident not only demonstrate our robust quality management system but also reinforce our professional standing within the global forging industry. We remain committed to advancing continuous improvement with a strong sense of responsibility, delivering higher-quality, more reliable metal forging products and services to customers worldwide.

 

LATEST

Contact INNOVAW to Get Started!

Request a Quote
  • Email:

    sales@innovaw.com

    Michael_Dong18@hotmail.com

  • Headquarter Add:

    904-905, China-base Building, No.666, Tiantong South Road, Ningbo 315100, China

  • Automotive Division Add:

    NO. 45, Baofeng Road, Eastern Suburb Development Zone, Fenghua 315500, China

  • Aluminum Forging Division Add:

    Shaojiadu Street, Linhai City, Zhejiang Province 317000, China

    Forging Web

浙ICP备17013668号-2
Enter your inquiry details, We will reply you in 24 hours.

Note: If you are looking for a job, please send an email to it2@innovaw.com

Send
Document
Document